Illustrative UK site setting for a compact modular office

Site / Supplier reference

FPC 023

A compact flat-pack shell reference for a project-specific office or controlled-access brief.

Evidence position

The shell is a starting point; the duty defines the door.

The supplier reference shows a simple personnel entrance and barred-window arrangement. That is product evidence, but not proof that the openings are suitable for UK security, accessibility, escape, fire or intensive operational use.

Visual disclosure: the operational scene above is illustrative. The clean study below is ALDERVYN configured model-reference CGI; final openings, hardware and shell specification are confirmed in writing.
Supplier item
FPC 023
Brand on source
Moneybox
Supplier-stated MOQ
1 set
Supplier-stated lead time
10–20 working days after deposit
Colour
Supplier states customised

ALDERVYN configured study

FPC 023 shell with a commercial entrance.

This clean CGI keeps the compact flat-pack form and barred-window reference while illustrating a steel personnel door suitable for detailed project specification. Hardware, handing, escape function and security rating remain subject to the approved door schedule.

MBS House / Moneybox source

Specify the duty, then freeze the schedule.

Supplier-stated, not UK approval: the supplier lists customised colour, MOQ 1 and a 10–20 working-day production lead after deposit. The public material does not provide sufficient model-specific construction or performance data for UK approval.
Private provenanceUnaltered supplier originals and exact source links are retained in ALDERVYN's internal evidence record, not published as marketing imagery.

Opening schedule

Specify the duty

Security rating, fire and escape role, accessibility, weathering, glazing, locks, closers, thresholds and ironmongery are confirmed for the application.

Envelope evidence

Request the build-up

Frame, panel, insulation, junction, floor, roof and corrosion schedules must be tied to test evidence and calculations.

Site integration

Design the deployment

Foundation, lifting, electrical, data, heating, ventilation, water, waste and relocation plans sit outside the marketing image.

Project gate

No generic door schedule.

FPC 023 remains a shell reference until the precise operational use and a complete UK-facing technical specification are agreed.